Summary Numbers Story Cheat Sheet

Squid: Connecting the pieces of grid planning.

Squid aims to help electricity network companies plan from one shared, up-to-date model of their grid. In its first 10 months it launched two tools with National Grid Electricity Distribution (NGED). It now wants to reach the engineers who plan grid investment.

  • YC W26 batch
  • As of November 2026
  • Sources: Ofgem, NGED, EPRI, ACER, Companies House

Squid

Squid is a London software company founded in December 2025 by Conor Jones and George Kolokotronis. It is backed by Y Combinator (YC), a Silicon Valley programme for early-stage start-ups [1][2]. Engineers who plan electricity networks often work from different versions of the same network model, which makes changes hard to track. Squid is building one shared record of cables and substations that keeps every change and approval [3]. Its first two tools, launched with National Grid Electricity Distribution (NGED), help publish and explore network data [4][5]. Both founders held senior roles at Octopus Energy, and Jones spent about nine years at National Grid.

All product names, logos, and brands are property of their respective owners. Use of these names, logos, and brands does not imply endorsement, affiliation, or sponsorship.

Three numbers that frame the pitch.

/01

7 weeks

From incorporation to first live tool

/02

£716M

NGED's upgrade allowance, 2023 to 2028

/03

5 owners

of all 14 of Britain’s regional networks

At a glance.

Company snapshot

CompanySquid Labs Ltd (London) and Squid Group, Inc. (US); founded 2025 [1][2][6]
BatchY Combinator (YC), Winter 2026 [1]
FoundersConor Jones (CEO), ex-National Grid and Octopus Energy [1][7]
George Kolokotronis (CTO), ex-Octopus Energy, co-founder of VoltQuant [1][7]
TeamFive (YC listing, 12 November 2026) [1]
ProductA shared model of an electricity network that records every change and approval; live tools FlexPortal and CIM Explorer [3][4][5]
IndustryElectricity networks: software for network planning
CustomersNetwork companies. NGED is named as launch customer. Northern Powergrid and European operators are also named, which we could not independently confirm [3][4][5]
PricingNot public
FundingYC, 33East and at least six other named investors. A few million dollars, by Squid's account. The exact amount is not public [8][9]

Squid's growth depends on moving beyond publishing tools to become the system engineers rely on for grid planning. We see three stages: publishing tools, planning workflows and a shared model. Its two closest predecessors each took more than a decade to reach a sale.

Chapter 1

Industry trends:
Who decides where the money goes.

Electricity reaches British homes and businesses through 14 regional networks of cables, substations and transformers. The companies that run them are distribution network operators, which this report calls network companies. Five groups own all 14 [10][11]. Above them sits the national transmission network, which carries power long distances at high voltage.

How electricity reaches homes and businesses

  1. Power stationsGenerate electricity
  2. TransmissionNational, high voltage
  3. Network companies plan upgrades here14 regional networksFive owner groups
  4. CustomersHomes and businesses
Where Britain's network companies sit in the electricity system.

The network companies' work is changing quickly. Electric cars, heat pumps, solar panels and new data centres all need connecting. Each new connection raises the same question: whether the existing cables can take the extra load. Answering that question is called network planning.

Planning decides where large sums go. In November 2022 the energy regulator Ofgem set each company's allowance for 2023 to 2028 for upgrades driven by new demand and generation. NGED's was £716M in 2020/21 prices, or £851M after adjustments for changes to how connections are charged [12]. Customers pay for these upgrades through their bills, so Ofgem examines how each company justifies them.

How a grid plan gets made

  1. 1A request to connectA charger, heat pump or new site asks for capacity
  2. 2A study on the network modelEngineers test the request on a digital copy of the gridThe model has to be right
  3. 3An investment decisionThe network company decides what to upgrade
  4. 4Ofgem's reviewThe regulator checks the spending is justified
If two engineers study different versions of the model, the decision can be wrong.

Engineers cannot try ideas on the real network, so they test them on a computer model. A network model is a detailed digital map of every cable and substation, with the electrical settings needed to simulate power flows. A planner adds a proposed connection to the model, runs a study and checks whether anything would overload. If the model is wrong, or two engineers use different versions of it, the decision can be wrong too.

Chapter 2

The problem:
Why one trusted model is hard to keep.

Keeping one correct model sounds simple, but three things work against it: the master record, the many tools and changes made by hand.

The master record is not built for studies

Most network companies keep a master record of their equipment, but it was designed for other purposes. EPRI, the independent research body of the American power industry, described the usual pattern at US utilities in 2021 [13]. The master record is typically a mapping system that grew out of paper maps. It shows where equipment is, but its electrical connections are often wrong. It also lacks data that studies need, such as the electrical properties of cables and the loads they carry. So for each study, engineers take out the part of the network they need, convert it for their simulation software, and fill gaps or fix errors inside that tool [13].

Engineers use several tools

British network companies rarely rely on one piece of software. A 2015 review for the Institution of Engineering and Technology (IET) found that a company's modelling can span several software packages [14]. Moving a model between them takes work. In one Electricity North West project, a network model held in IPSA, a widely used package, was converted into another, PowerFactory, with software written for the job [15]. The IET review describes such conversions as laborious and prone to error [14].

Changes often travel by hand

When study tools keep separate copies, changes have to be carried between them, often by hand. EPRI warns that this manual updating breeds data errors, and that data errors lead to wrong analysis [13]. Based on EPRI's description, this is where copies drift apart: a fix made inside one study tool improves that copy but leaves the master record and the other copies unchanged.

A British company has described the same difficulty. SSEN runs two of the 14 networks. Its 2019 digital strategy named fragmented and orphaned data sets as a challenge, and set out to bring its planning and operational data into one digital map [16]. EPRI adds that duplicated manual modelling is rarer in distribution than in transmission, given the volume of work, and that most companies keep one master record [13]. The gap sits between that record and the models engineers study.

Where copies come from

Master recordThe company's mapping system
  • Study tool ACopied last month
  • Study tool BCopied last week
  • Study tool CCopied in March
One master record feeds several study tools. Each copy is updated on its own and keeps its own fixes, so the copies drift apart. Based on EPRI (2021) and the IET review (2015) [13][14].

Take a request to connect a new charging hub for electric vehicles. One engineer studies it on last month's copy of the model, while a colleague's copy already includes a substation upgrade finished last week. The two studies can reach different answers, and months later it may be hard to show which version the final decision relied on.

Why a clear record matters

Ofgem expects network companies to show their working, and marks down spending they cannot justify. NGED, then called Western Power Distribution, submitted 193 engineering papers behind its plans for 2023 to 2028, and Ofgem's engineers reviewed 187 of them. The draft decision in June 2022 rated 48 of those unjustified [17]. The cases Ofgem described in detail fell short because the company had not shown why the work was needed, or which individual assets it would replace. After NGED supplied more evidence, only three remained unjustified at the final decision in November 2022 [12]. At Northern Powergrid, another of the five owners, the count fell from 13 of 61 to one in the same way [18].

Spending cases Ofgem rated unjustified

  • Draft decision, June 2022
  • Final decision, November 2022
Share of engineering papers rated unjustified in Ofgem's decisions for 2023 to 2028 [17][12][18]. NGED's shares use the 187 papers Ofgem's engineers reviewed.

None of the cases Ofgem named turned on conflicting copies of a network model, so we read the episode narrowly. When the reasoning behind a decision is hard to show, a company has to rebuild it under scrutiny. A model that records which version each study used should make that work easier.

That is the gap Squid wants to fill: one trusted version of the model, with a record of every change, who made it and who approved it. Software developers solved a similar problem decades ago with version-control tools such as Git. These keep a shared history of every change to a piece of code in a store called a repository, or repo. Squid's homepage puts its ambition in six words: "The grid has a repo now" [3].

Chapter 3

Why now:
Regulation drives the timing.

Three developments are making a trusted model more valuable: new rules on publishing network models, closer scrutiny of spending, and AI planning tools. The first matters most for Squid. A rule due on 30 November 2026 could give network companies a reason to buy software that records changes to their models. The companies have asked Ofgem to reconsider it. If it stays, demand for such records could come sooner, though companies may be able to meet it with their existing systems or suppliers. If it goes, the other publishing duties remain, and Squid has to win each sale on the value of better planning.

New rules on publishing network models

Ofgem now requires network companies to publish their network models in a shared data format called the Common Information Model, or CIM [19]. A shared format lets different software read the same model. Europe's transmission operators already use it to exchange grid models [20], and the first British distribution models in this format appeared in November 2025 [21].

The next stage is due on 30 November 2026. Each company must then publish a model of its network for each of the next five years. The companies have said these future-year models will include all their planned changes, from new generation connections to reinforcements and equipment upgrades [19]. The rules also ask for a separate file for every project whose funding is secured, listing only what that project changes. These are called difference models [19]. They work like tracked changes in a document: the model of today's network is the base, and each project is a set of changes against it [22].

Set against how version control works, that requirement covers the first part: recording each project's changes against a base. The base keeps moving as other projects finish, so keeping the records correct means tracking which version each one started from. The rule does not ask for a repository, and a company may be able to produce the files from systems it already has. Approving changes, resolving conflicts and keeping a full history go further. Those are the parts Squid’s wider ambition covers, and they need their own commercial case.

What the companies told Ofgem

The network companies have been open that the tools are still developing. In 2024 they told Ofgem that some tools for testing these files were not yet available from software suppliers. They said some suppliers would also need to add the ability to record differences [19]. In April 2026 they went further and asked Ofgem to reconsider several requirements, difference models among them [19]. One reason was to avoid depending on systems being ready to produce or read them. Another was to avoid duplicating the future-year models. Ofgem has kept 30 November 2026 as the publication date, and has said any further change would need evidence from engagement with the people who use the data [19].

Two ways the rule could go

OutcomeWhat it means for network companiesWhat it means for Squid
Difference models stayThey need to record each project’s changes against a moving base, by a deadline. Existing systems may be able to do itA possible demand driver for recording differences, which some suppliers would need to add. Squid’s wider model governance still needs its own commercial case
Difference models are dropped or replacedThey publish a full model for each future year. They still need to manage versions, but no rule checks howThe other CIM publishing duties remain, but none asks for a record of each project’s changes. Squid has to win each sale on the value of better planning

Closer scrutiny of spending

The network companies' next five-year spending plans, known as ED3, cover 2028 to 2033 and are due with Ofgem in December 2026 [23]. Ofgem has said it will control capital spending through strong evidence thresholds [23]. It also expects each company to explain how it weighs new cables against alternatives, such as paying customers to use less power at busy times [24]. In our reading, a model with a clear history should make that evidence quicker to assemble, though this is untested. The deadline could also work against Squid, if companies stay with established suppliers while they prepare their plans.

AI planning tools

Investors are backing software that uses AI to speed up planning studies: ThinkLabs AI raised $28M and GridCARE $64M in 2026 [25][26]. Squid's launch post describes AI-powered grid planning on a live, versioned grid map [1]. An AI tool that suggests where new demand can connect is only as reliable as the model it reads. So the more planning relies on AI, the more a trusted model is worth. AI planning companies could become partners for Squid, or they could build their own model layer instead.

Chapter 4

What Squid is building:
From data tools to model management.

Squid's aim is to become that trusted record. Its website describes a repository that brings a network company's data sources together into one controlled model, where every change is checked and approved. Engineers can also branch off scenarios to test ideas [3].

How version control carries over to grids

The software comparison holds most of the way, though networks make each step harder.

Commit, branch and merge on a grid model

Software ideaGrid versionWhat makes it harder for grids
Commit: a saved, approved changeAn approved state of the network modelAn engineer must also confirm the network still works electrically
Branch: a copy for trying ideasA planning scenarioA scenario can be physically unworkable even when its data is valid
Merge: combining two versionsBringing two engineers' changes togetherConflicts can reflect different engineering judgements, which need a person to resolve

Version control for network models already exists inside individual tools. In PowerFactory, a widely used simulation package, a model administrator issues versions of a base model and engineers work on derived copies. A compare-and-merge tool then brings changes back, with a separate dialog for resolving conflicts [27]. The open question for Squid is narrower and harder: whether one record can be kept across the several tools a network company uses [14]. It would have to start from a master record that was never built for studies.

How a change becomes part of the trusted model

  1. Change proposedBy an engineer
  2. Automatic checksTopology, parameters
  3. ApprovalBy an engineer
  4. Joins the trusted modelMerged, with historyEvery change kept
Squid describes this flow on its homepage, checked 12 November 2026 [3]. We couldn't find it shown in public yet.

Keeping one record across tools is hard for two reasons. First, every conversion between tools risks losing information. The first published CIM models were a partial release, in November 2025. TNEI, which owns the IPSA package, judged in May 2026 that they were not yet ready for load flow studies in most practical cases [21]. Second, a merge that is clean as data can still fail as a network. Two projects that each work alone can overload a cable together, so a combined model has to be checked by a study as well as by comparing files. Europe's transmission operators took 12 years to get from their first CIM exchange specification, in 2009, to a live European merging process, in 2021 [28].

Where Squid started

Squid's first two products are smaller in scope, and both are live with NGED. FlexPortal, launched in February 2026, turns NGED's report on its flexibility market into an interactive tool [4]. In that market NGED pays customers to shift their electricity use. CIM Explorer, launched in March 2026, makes the network model files NGED must now publish readable by people without specialist software [5]. NGED lists both among the case studies on its open data portal [29]. Neither tool yet shows the cross-tool neutrality that sets Squid apart, since both work on data NGED already publishes.

NGED has backed both tools on the record. Doerte Schneemann, its Head of Flexibility Markets, named Squid as NGED's partner on FlexPortal [4]. Phil Moseley, its Head of System Models and Data, spoke about CIM Explorer. NGED said the tool would reduce one-off data requests and help it engage with people outside the company [5].

Why publishing is a sensible first step

The publishing duty applies to every British network company [19], and public data asks less of a company's security and approval processes. CIM Explorer also puts Squid alongside the people who look after NGED's network models [5].

NGED's master model lives in its own Integrated Network Model, built with the IT company CGI through an earlier innovation project [30][31]. We did not find a public source describing Squid's software working inside it.

Holding the model, or governing it

There are two ways Squid could become the trusted record. It could hold a network company's master model itself. Or the company could keep its model while Squid governs it, recording what changed, who reviewed it and which version fed which study. The second is more plausible. Holding the master model would mean replacing a system such as NGED's Integrated Network Model [30][31], with a much higher bar for procurement and continuity. Governing a model the company still owns fits the IET finding that companies prefer to keep the tools they already use [14].

It also gives Squid a clear test. The future-year and difference models due on 30 November 2026 are records of planned change [19]. The test is whether Squid can help a network company produce records like these, as well as display them once they are published.

The adoption ladder

We describe Squid's path as a ladder with three rungs. The order is not fixed, and Squid could win work on a higher rung without first winning the ones below. A higher rung would usually bring a different buyer, a larger budget and a higher price, and make Squid harder to replace. That dependence also makes the higher rungs harder to win. A record that feeds a company's evidence to Ofgem is the kind of system utilities adopt slowly and carefully.

The three rungs

RungBuyer and budgetWhat it would takeEvidence so far
1.Publishing and data toolsSquid is hereData and market teams, from their own budgetsTools that work on published dataTwo live tools with NGED, with named public backing [4][5]
2.A planning workflowPlanning teams, likely paid from IT and telecoms allowancesStudies run on Squid's model, with history and sign-offNone public yet. An earlier advert for a software engineer with load-flow study experience pointed this way [32]
3.A shared model layer across toolsPlanning and IT together, as a company-wide systemOne record kept across the company's tools and linked to its master recordNone public yet. The two earlier companies ended up inside larger suppliers' ranges [33][34]

Moving from the first rung to the second changes most of the sale. Squid would need a company's internal models as well as its published data, and planning engineers as well as data teams. It would also face a security review and a different way of buying, likely from IT and telecoms allowances. Its work with NGED shows Squid can win access and deliver, but most of the second sale is still untested.

Chapter 5

Competitive landscape:
Established suppliers and predecessors.

Squid is entering a field with established players, which suggests the problem is real. Grid-planning software has several layers. Squid's sits in the middle, between the systems that record what the network looks like and the tools that simulate how it behaves [3].

Grid-planning software in five layers

Starts with: the grid as builtEnds with: a finished plan
A3D network copies
Detailed 3D copies of the lines and poles.
Neara
BThe model layer
One trusted copy of the network, with every change recorded.
Squid Siemens Gridscale X AspenTech Cimphony IPS-Energy NMM
CSimulation
Works out how power flows and what fails.
DIgSILENT PowerFactory Siemens PSS®E ETAP Eaton CYME TNEI IPSA

Underneath, serving simulation

DFaster studies
Speeds up the simulation tools above.
Pearl Street (now Enverus) ThinkLabs AI GridCARE Nira Energy
EBuilding blocks
Free open-source code that simulation and faster-study tools are built on.
pandapower PyPSA GridCal
Squid's own material places it in the model layer, and some products span more than one [3]. Products as named on suppliers' own pages, November 2026 [35][36][37][38][39].

Large suppliers already sell products for managing network models: Siemens with Gridscale X Network Model Manager, AspenTech with Cimphony, and IPS-Energy with its own system [35]. Siemens' PSS®MOD records planned network changes for transmission planning [40]. Simulation tools such as DIgSILENT's PowerFactory also version models themselves [27].

A layer that works across suppliers

Network companies use software from several suppliers to manage and study their networks [14]. The IET review found this in 2015, and the companies' November 2024 letter to Ofgem is newer evidence that they use different packages [19]. A product that works across all of them, without favouring one supplier, could be valuable. It is also hard for any single supplier to build, since each has reasons to favour its own tools.

The IET review also found that companies prefer to extend the tools they already use, and are unlikely to move to an entirely new platform, even one that does everything [14]. A layer that sits alongside existing tools fits that preference. So does a supplier's own versioning, such as PowerFactory's [27], since a company can extend a tool it already uses without adding a new layer.

Governing a model the network company keeps also shapes Squid's relationship with established suppliers. Squid would need their tools to keep working on the same record, so suppliers such as DIgSILENT or Siemens could be partners as well as rivals. An integration partnership with one of them would be an early sign of that path.

Model management is already in use at British network companies. SSEN's MERLIN project (2019 to 2021) used Open Grid Systems' Cimphony tool [41]. Its NeRDA project (2020 to 2024), built with Open Grid Systems, makes near real-time network data available to stakeholders through an API [42]. SSEN now describes its Network Model Manager as the "single source of truth" for planning [43]. CGI says its Integrated Network Model was being delivered into NGED and SP Energy Networks, in an undated brochure that predates NGED's 2022 renaming [30][44]. So a model layer already exists in at least two of the five groups. That fits the case for governing a model a company keeps. Public detail on these systems is limited, which may reflect how complex they are to implement.

Advantages that could build up around neutrality

Neutrality helps only if advantages build up around it. At 10 months, most of them would not be expected to show yet. Importing from many tools can help Squid enter, but governing the record and the approvals is what would make network companies depend on it.

Seven possible advantages, and the evidence so far

Source of advantageWhy it would protect SquidEvidence so far
Imports models from several toolsNetwork companies use several packages, and a neutral layer can sit across all of them [14]Stated by Squid: PowerFactory, PSS®E, IPSA, CYME and ETAP [3]
Keeps one record across tools, with approvalsPlanning teams would come to rely on one governed record and its sign-offsNot yet shown in public
Accumulated model historyYears of recorded changes are hard to move to another supplierToo early to see, since no deployment of the repository is public
IntegrationsEach connection to PowerFactory, PSS®E, IPSA or an asset system takes work to replaceCIM Explorer reads NGED's published CIM files [5]. Squid states that it contributes to the GB CIM Advisory Group [3]
Approval workflowsEngineers' sign-off history becomes part of the regulatory recordDescribed on Squid's homepage [3]
Security and procurement approvalA utility's security review is slow for a rival to repeatCyber Essentials [6] and ISO 27001 [45] confirmed. Squid states it holds SOC 2 reports, which we could not independently confirm [46]
Switching costTogether, the points above would make Squid costly to replaceNot yet established from public deployments

The open CIM standard that makes a neutral layer possible also makes it easier for anyone, including established suppliers, to build one. Squid's protection would therefore come from the history, integrations and approvals that build up on top of the standard, more than from the standard itself. The standard now extends to model management. In July 2026, ENTSO-E, the association of Europe's transmission operators, approved the first version of an implementation guide for CIM-based network model management [47]. A shared guide could make neutral model layers easier for buyers to compare, and easier for rivals to build.

The companies that came before

Several companies built products close to Squid's, and larger suppliers bought them. Open Grid Systems, founded in Glasgow in 2010, developed Cimphony and was bought by AspenTech in November 2024 for $48.9M, as part of expanding AspenTech's grid-management software [33][48]. Elpis Squared, founded in 2013 and based in Newport Beach, California, sold grid analytics software, including a model validator, to large American utilities. Itron bought it in March 2024 for about $35M [34].

Years from founding to sale

The two closest earlier companies, against Squid at 10 months [33][34][48]. Company filings, 2024 to 2025.

Both took more than a decade to be acquired, and both sold for tens of millions of dollars. These sales show what larger suppliers have paid for this kind of software. They don't set a likely outcome for Squid. Two more followed the same path in 2026. PowerGEM bought Power Info, a CIM model-management company founded in 2007, in August, on undisclosed terms [49]. Neara bought Zepben, an Australian CIM-based network modelling company, in October [50]. Every close predecessor we found has ended up inside a larger supplier's range. Squid's case for staying independent therefore rests on neutrality across those ranges, and on whether a supplier-neutral layer is worth buying separately.

The public record does not say why each became part of a larger supplier's range. Three explanations are possible, and each would mean a different risk for Squid. The first is market size: there are only so many large network companies, so even a strong specialist runs out of new buyers. The second is how utilities buy: they prefer to extend the suites they already use [14], and AspenTech described buying Open Grid Systems as expanding its own grid-management suite [33]. The third is timing: CIM has only recently become routine, with Europe's merged grid model live in 2021 [28] and British publication from 2025 [21]. Owners may also have sold for reasons the record doesn't show.

Chapter 6

Strengths:
A fast, credible start.

Squid is 10 months old, so we judge it against what is normal for a company of that age selling to network companies. Some things would be unusual at this stage: a paid planning contract, published prices, revenue figures or customers outside Britain. On that measure its start is strong, with public evidence of customer access and delivery. Product-market fit is a later question. Its timing helps too, since it arrived as the publishing rules and ED3 began pushing network companies towards what it builds [19][23].

A founding team close to the problem

By his own account on LinkedIn, Conor Jones spent about nine years at National Grid, latterly in digital product roles, before leading product at Octopus Energy and VoltQuant [7]. George Kolokotronis co-founded VoltQuant as chief technology officer and then led technology at Octopus Energy [7]. Squid's YC profile adds BCG to Jones's background and AWS and Cambridge to Kolokotronis's, and describes Kolokotronis as a repeat founder in energy and clean tech [1]. Together they have experience of how network companies buy digital products and of building energy software.

Speed, and public backing

Squid launched a live tool with NGED seven weeks after incorporating, on 11 February 2026, and a second a month later [2][4][5]. Two named NGED managers backed the tools in public, which gives later buyers a reference point [4][5]. The next test is a second network company.

Security certifications and scope

Squid holds a Cyber Essentials certificate, the UK government-backed baseline for cyber security, covering both its British and American companies [6]. Its American company, Squid Group, Inc., holds ISO/IEC 27001:2022, a widely used information-security standard, listed as active on the IAF CertSearch register [45]. Squid states it also holds SOC 2 Type I and II, with reports on request [46][51]. SOC 2 is an audit report rather than a certificate, so no register lists it. Squid states that it "operates at the planning layer, not the control layer" and "never writes to OT, SCADA or ADMS", the systems that run the live network [51]. As Squid moves towards governing a network company's working model, which is sensitive data, certified security will matter more.

Chapter 7

The market:
Who buys, and how many buyers there are.

Who buys

Squid sells to a small number of large network companies. In Britain, five groups own all 14 regional networks [10][11], and Squid's documented work is with one of them. Squid's homepage also states that it is launching with Northern Powergrid and further European network operators, which we could not independently confirm [3].

Britain's 14 regional networks and their five owners

All of Squid's documented work is with one of them. Hover or tap an area to see its owner.

  • NGED: documented work
  • Northern Powergrid: named, not independently confirmed
  • UK Power Networks (ENGIE)
  • Iberdrola
  • SSEN

Inspector

No area selected. Hover or tap an area on the map to read its status.

Ownership as of October 2026 [10][11]. Iberdrola bought Electricity North West in 2024, and ENGIE completed its purchase of UK Power Networks on 7 May 2026. Northern Ireland is not shown: NIE Networks runs its network, which Ofgem does not regulate. Boundaries: NESO, GIS Boundaries for GB DNO Licence Areas, 2020 edition (simplified).

Europe is larger. ACER, the agency of EU energy regulators, counts 2,674 network companies in the EU and Norway [52]. Most are small. Operators with fewer than 100,000 customers together serve only about 8% of customers, and EU law lets countries exempt them from preparing network development plans. At least ten countries have done so for some, and almost two-thirds of EU operators are exempt [52][53]. The large companies must plan in public, so they are Squid's natural market. ACER has 2026 investment data on 191 of them, in 25 EU countries and Norway [52][53]. With Britain's 14, that makes at least 205 companies. The count is probably a floor, since ACER's investment data leaves out Bulgaria and Denmark.

Europe's network companies, large and small

  • Large companies (over 100,000 customers)
  • Small companies
By share of companies and of customers served [52][53].

Spending on these networks is rising. Investment in European distribution grids grew 51% between 2021 and 2024, to €35.3B a year, and ACER expects it to reach €46.7B by 2027 [53]. That means more planning decisions to justify, though it does not on its own show demand for model software.

European rules also push companies to publish. An EU directive of June 2024 requires distribution companies to publish the capacity available for new connections in their areas, in detail, and to update it at least every three months [54]. National laws were due by January 2025. So Europe's large companies have a publishing duty of their own, though it covers capacity and does not ask for network models or records of change.

Counting the buyers

The figure of at least 205 counts the networks that could use Squid's product. The number of separate buying decisions is smaller, because one group can buy for several networks. In Britain the 14 networks belong to five groups. Europe's large companies may sit in fewer groups too. Utility groups own networks across borders: two of Britain's five owners, Iberdrola and ENGIE, are continental groups [10][11]. We couldn't find a public count of Europe's groups.

Two ways to count the market

  • NGED's networks, the group Squid works with in public
  • Other large network companies
  • One owner group

Britain: 14 companies in 5 owner groups

Europe: 191 large companies (owner groups not public)

Companies measure how many networks could use Squid. Groups measure how many separate sales it would need [10][11][52][53]. Counts as of 5 November 2026.

Chapter 8

The commercial opportunity:
How a tool could become a business.

How a network company pays for software

Each rung of the ladder is paid from a different budget. Tools like Squid's first two come from a team's own budget, in smaller purchases whose approval thresholds are not public. Squid's work with NGED sits here, though whether NGED pays is not public. A planning workflow or a shared model layer would most likely be paid from the company's IT and telecoms allowance, judging by how Ofgem groups costs. For NGED that allowance is about £426M over 2023 to 2028 before adjustments, or £401M after [12]. The software's value lies in the far larger spending on the network itself.

Ofgem's innovation funding can be a route between the two, through the Network Innovation Allowance and the £450M Strategic Innovation Fund [55]. Open Grid Systems worked on Ofgem-funded innovation projects with SSEN from 2013/14 [56].

NGED has also asked Ofgem for more money for digital work. In August 2026, Ofgem's draft decision proposed £20.85M for three NGED projects, in 2020/21 prices, against £27.76M requested [57]. For a project that included a "Digital Twin capability", Ofgem proposed funding only the Connected Data Portal and a local energy planning tool. It also said the publishing rules do not require a digital twin [57]. A final decision is due by the end of 2026. If it holds, NGED's own data portal, which lists both of Squid's tools, will be funded [29]. That funds NGED's infrastructure and doesn't by itself fund or buy Squid's tools. Ofgem's reasoning suggests wider model software will need its own case for funding.

Where a shared record could save time

No public figures show how long planners spend rebuilding evidence or converting models today, so Squid would need to measure the gains itself to connect its product to a price. In our judgement, better evidence behind large upgrade decisions is the strongest source of value, and could justify a major purchase. Faster responses to data requests alone probably could not.

What Squid would need to show, by workflow

WorkflowToday, from the public recordWhat Squid would need to show
Justifying spending to OfgemOfgem's draft review rated 48 of the 187 NGED engineering papers it reviewed unjustified [17]Less time rebuilding the evidence behind a decision, with each decision linked to the model version behind it
Moving models between toolsConversions are laborious and prone to error [14][15]Engineer-hours saved on conversion and checking for each study

What a planning buyer will ask

Planning teams buy carefully, and their questions are predictable. They will want to know whether they can export their models if the supplier stops trading, and where their data sits. If AI helps build a study for a regulatory submission, they will want to know who answers for it, given that the network company still answers to Ofgem. Squid states that it never writes to the systems that control the live network [51]. We did not find answers to the other questions on its security page.

What Squid might charge

Squid's prices are not public, and network companies rarely publish what they pay for software. We have one rough comparable, so treat these figures as orders of magnitude. In 2023 Northern Powergrid awarded a £656,000 contract for a low-voltage planning tool [58]. It was a different kind of product, awarded without competition, and its length is not public. So it shows the scale of such purchases rather than a price for Squid.

A second yardstick is NGED's IT and telecoms allowance, roughly £85M a year on the £426M basis, in 2020/21 prices [12]. The whole £656,000 contract would be under 1% of one year's allowance. A planning platform at £1.5M a year, our illustrative figure, would be nearly 2%, which would put it in competition with the company's main systems for budget and attention. The allowance also covers telecoms networks, so software's share would be higher than these percentages suggest. The contract was awarded in 2023 and the allowance is in 2020/21 prices, so the comparison is approximate.

A purchase's share of NGED's yearly IT and telecoms allowance

The whole £656,000 contract and our illustrative platform price, against Ofgem's IT and telecoms allowance before adjustments, 2020/21 prices [12][58]. Allowance from November 2022. Contract awarded 2023. The price bases differ, so the shares are approximate. The price bases differ, so the shares are approximate.

How Squid could charge and grow

Network companies are few and large, so a price per company or per group is more likely than a price per user, in our view, with group-wide licences at the top rung. Growth would come from climbing the ladder inside each customer. Two things would decide the economics. How much setup each customer needs will shape Squid's margins and how fast it can add customers. And because Squid would govern a model the company keeps, a first purchase could be smaller in scope.

Illustrative annual revenue at full adoption

Suppose every large company in Britain and Europe bought at our illustrative price for each rung: £150,000, £500,000 and £1.5M a year. The totals would be roughly £30M, £100M and £300M a year. These are saturation scenarios for the 205 companies we could document. They are not a measured market size, or revenue Squid could expect. The count of 205 is a minimum, and Britain’s 14 companies would make up under a tenth of each total. The number of separate buyers is smaller, because one group decision can cover several companies. A business at the first rung could sustain a specialist company. In our three-rung model, the largest outcome comes from the top rung, across many companies, most of them in Europe. Other products or markets could change that.

Revenue if every large company bought at our illustrative price

  • Britain's 14 companies
  • At least 205 large companies
The prices are our illustrative assumptions: £150,000, £500,000 and £1.5M a year for rungs 1 to 3. Company counts come from Ofgem and ACER [10][11][52][53]. Our calculation, November 2026.

Chapter 9

Final verdict:
Progress and unanswered questions.

Squid is working on a real problem. EPRI, SSEN and the IET review show that network companies work across several tools and versions of their network [13][16][14]. Squid has made a fast, credible start, with two live tools and public backing from NGED within its first year [4][5].

What public sources show, and what they cannot yet

Public sources do not yet show a planning deployment, the terms of the NGED partnership, or demand beyond a publishing rule that is now under review. A planning team naming Squid, a second network company, or difference models staying in the rules would each change the picture.

What we'll watch

Three questions decide the outcome, in this order. The first is whether a planning team wants independent model governance. The second is whether Squid can deliver it reliably across tools. The third is whether it can repeat that at another network company economically. Our dated calls test each one.

Our dated calls

ByOur predictionWhat it would tell us
30 November 2026The companies publish their future-year models, and difference models stay in the rules in some form, possibly later or narrower [19]Whether companies face a deadline to record planned changes, which Squid or existing suppliers could meet
December 2026At least one network company's ED3 plan asks for funding to manage its network model across tools [23]Whether planning budgets for 2028 to 2033 include the layer Squid wants to fill
31 December 2026Ofgem confirms funding for NGED's Connected Data Portal, broadly as proposed in August [57]Whether NGED's own portal, which lists both of Squid's tools, has money behind it until 2028
31 March 2027Squid releases a feature that records model versions or approvals on a network company's own modelHow far the product has moved beyond publishing tools
30 June 2027Northern Powergrid, or another British network company, confirms work with Squid in publicWhether the product repeats beyond NGED
31 December 2027A planning team at a British network company is named as using or trialling SquidProgress towards the planning budget, during Ofgem's review of ED3 plans
31 December 2027A first European network company confirms work with Squid in publicWhether Europe, where most large network companies sit, is open to Squid
Rule dates as of 5 November 2026.

What could slow it down

Planning teams are careful buyers, and established suppliers can add version tracking to their own tools. The publishing rules could also shift, since the companies have asked Ofgem to reconsider difference models [19]. A rule can also stop short of creating demand: Ofgem's draft view is that the publishing rules do not require a digital twin [57].

Funding and runway

Squid said in July 2026 that it had raised a few million dollars [9]. The exact figure is not public. It named YC and seven other investors: 33East, Leap Forward Ventures, 20VC, Angel Invest, Energetik Ventures, MyAsiaVC and gumi Inc. Scouts from a16z and individual angels also took part [9]. 33East has confirmed its investment in a post of its own [60]. Squid’s homepage shows three of the investors: 20VC, Leap Forward and 33East [3]. Squid also has YC's standard $500,000 deal, the same for every company in a batch [59]. We do not know whether the few million dollars includes it.

We found no matching Form D in SEC EDGAR under the entity names we searched, Squid Group, Inc. and Squid Labs, as of 8 November 2026 [9]. A Form D is the notice US companies usually file after raising money privately. The result does not contradict Squid's statement: a filing could sit under another legal name, filings can come late and not every round needs one. Sales to network companies can be slow and the size of Squid's funding is not public, so the timing of larger contracts matters.

Key numbers and their yardsticks

One of these comparisons needs care. The full-adoption revenue scenarios in the previous chapter are annual revenue in pounds, while the earlier companies' sale prices were one-off payments in dollars, so the two are not directly comparable.

What we measured, and against what

MeasureSquidBasis for comparison
First live tool with a network companySeven weeks after incorporation [2][4]Open Grid Systems: about four years to its first British innovation projects, with SSEN in 2013/14 [33][56]. The products differ, so this compares speed of access and leaves out depth of work
Live tools with NGEDTwo, both working with published data [4][5]Both listed on NGED's open data portal [29]. Work on a company's own model would be the next step
Public backingTwo named NGED managers [4][5]We found no public figure for the two earlier companies at the same age
SecurityCyber Essentials [6] and ISO 27001 [45] confirmed. SOC 2 reports stated by Squid [46]Cyber Essentials is the government-backed baseline
Buying groups, then large network companies5 groups in Britain, then at least 205 companiesEurope's group count is not public. ACER's investment data leaves out Bulgaria and Denmark
Scale of a comparable purchase£656,000 in total, under 1% of one year of NGED's IT and telecoms allowanceA different product, awarded without competition. It shows the scale of such purchases rather than a price for Squid
Outcomes for the two closest earlier companiesNot applicable at 10 months$48.9M after 14 years, and about $35M after 11 years
Outside capitalA few million dollars, by Squid's account [9]YC and at least seven named investors. 33East has confirmed its own investment [60]. The exact figure is not public. YC invests the same $500,000 in every company in a batch [59]

Squid has shown it can deliver for a large network company. Its next test is whether network companies will trust an independent supplier to govern the models their existing suppliers already help them maintain.

Chapter 10

Fact sheet:
Reported claims and public evidence.

This report relies on public sources only. For a company this young, much of what matters can only be reported by the company itself, so the table shows how far each claim is supported by someone else. A claim we could not independently confirm is not thereby doubtful. Most information about a young private company is unconfirmed.

Claim ledger: what the public record confirms

  • Confirmed
  • Sourced from company material
  • Our inference
ClaimVerification
A team of five people [1]Sourced from company material
The founders' career history [1][7]Sourced from company material
Squid describes a repository supporting model imports, version history, scenarios and approvals [3][46]Sourced from company material
NGED as "launch customer", and Northern Powergrid and "further European network operators" under "launching with" (not confirmed by Northern Powergrid) [3]Sourced from company material
A few million dollars raised from YC and at least seven named investors (no matching Form D found on EDGAR under the names searched, as of 8 November 2026) [9]Sourced from company material
SOC 2 Type I and Type II reports, and GDPR compliance (reports on request; no public register) [46][51]Sourced from company material
Squid's two tools are live with NGED [4][29]Confirmed
Incorporated on 22 December 2025 [2]Confirmed
Cyber Essentials certificate [6]Confirmed
ISO/IEC 27001:2022 certificate held by Squid Group, Inc. [45]Confirmed
Ofgem figures: upgrade, IT and telecoms allowances, engineering-paper counts and publishing-rule dates [18][12][17][19]Confirmed
European counts: ACER's 191 large companies, 2,674 operators and customer split [52][53]Confirmed
Earlier companies' sale prices and dates [33][48][34]Confirmed
33East invested in Squid, alongside YC and other named investors [60]Confirmed
Our calculations: allowance shares and full-adoption revenue scenariosOur inference

Glossary.

TermMeaning
DNODistribution network operator. A company licensed to run one of Britain's 14 regional electricity networks. This report calls them network companies
CIMCommon Information Model. A standard way of describing an electricity network as data, so that different software can read the same model
LTDSLong Term Development Statement. What each British network company publishes about its network and planned changes. Ofgem now requires network models in CIM as part of it
Difference modelA file that lists only what a project adds to or removes from a base model, in place of a full copy
Load flowA study that calculates how power moves through a network, and whether any cable or transformer would overload
GISGeographic information system. The mapping system many network companies use as their master record of equipment and where it sits
RIIO-ED2 and ED3Ofgem's five-year spending settlements for the network companies. ED2 runs from April 2023, and ED3 from April 2028
Network Innovation AllowanceMoney Ofgem lets each network company spend on innovation projects of its choosing, paid for through bills
Strategic Innovation FundOfgem's competitive fund for larger innovation projects, worth £450M across RIIO-2 for gas and electricity networks. Distribution companies could lead projects from 2023
RepositoryIn software, a store that keeps a shared history of every change. Squid uses the term for its record of a network model
CommitA saved change, with a record of who made it and when. For grids, an approved state of the network model
BranchA separate copy for trying out changes without affecting the main version. For grids, a planning scenario
MergeCombining the changes from two versions into one. For grids, the combined model also has to be checked by a study

References & Citations

  1. Y Combinator, company profile for Squid: "AI agents for power grid planning", founded 2026 by Conor Jones and George Kolokotronis, 5 employees, London; founder bios (BCG, AWS, Cambridge, repeat founder in energy and clean tech); group partner Gustaf Alstromer; no open roles on its jobs page on 12 November 2026, after an earlier listing at £70,000 to £120,000 plus 0.50% equity closed. Squid's own job board on Rippling listed two general roles in London on 12 November 2026, Software Engineer and Software Engineer (Data Platforms). Also the Launch YC post "Squid: AI-powered grid planning in your browser", which describes "a live, versioned grid map". ycombinator.com (accessed 10 November 2026); Launch YC post; ats.rippling.com (Squid jobs)

  2. Companies House, SQUID LABS LTD (company no. 16925657): incorporated 22 December 2025, with directors Conor Jones and George Kolokotronis. find-and-update.company-information.service.gov.uk (accessed 6 October 2026)

  3. squid.energy: homepage, product sections and deployment copy, including the launch-customer and investor sections. On 5 November 2026 the homepage stated that Squid is launching with Northern Powergrid and further European network operators, contributes to the GB CIM Advisory Group, and imports models from PowerFactory, PSS®E, IPSA, CYME and ETAP. squid.energy (re-checked 5 and 12 November 2026)

  4. The Energyst, "National Grid DSO launch new interactive FlexPortal", 11 February 2026. Also National Grid DSO's news page for the launch, dated 17 February 2026, with a quote from Doerte Schneemann, Head of Flexibility Markets, naming Squid as NGED's partner. theenergyst.com; dso.nationalgrid.co.uk (accessed 29 September 2026) Archived 11 November 2026: web.archive.org (NGED); web.archive.org (The Energyst).

  5. The Energyst, "National Grid DSO partners with Squid to improve accessibility of electricity network data", 19 March 2026, with quotes from Phil Moseley (Head of System Models & Data, NGED) and Conor Jones. theenergyst.com

  6. IASME, Cyber Essentials Certificate Search, run for the NCSC: basic-level Cyber Essentials certificate, reference a70be75f-bef0-415f-b80d-eeac29680bda, certified 10 June 2026 and expiring 10 June 2027, listed under the same reference for both Squid Labs Ltd and Squid Group Inc. iasme.co.uk/cyber-essentials/ncsc-certificate-search/ (searched 16 October and 12 November 2026)

  7. Y Combinator founder pages: Conor Jones, chief executive, previously at Octopus Energy, VoltQuant and National Grid, with BCG in his YC bio. George Kolokotronis, chief technology officer, formerly Head of Technology at Octopus Energy, with AWS, Cambridge and earlier founding roles in his YC bio. Geovation, VOLTQUANT start-up profile: George Kolokotronis as CTO and co-founder, company founded February 2023. Conor Jones's years at National Grid come from his own LinkedIn profile, which needs a login. ycombinator.com (Conor Jones); ycombinator.com (George Kolokotronis); geovation.uk (accessed 10 November 2026)

  8. Cyprus Business Now, "Cyprus-focused venture capital firm 33East announces the success of first year of operation", 19 May 2026: names Squid ("AI grid planning for utilities") as a portfolio highlight. cbn.com.cy (accessed 12 November 2026)

  9. Squid, LinkedIn company post, 23 July 2026: "We've raised a few million dollars", naming YC, 33East, Leap Forward Ventures, 20VC, Angel Invest, Energetik Ventures, MyAsiaVC, gumi Inc., scouts from a16z, and angels. A search of SEC EDGAR found no Form D for Squid Group, Inc. or Squid Labs (reviewer's check, 8 November 2026). On 12 November 2026 the post no longer opened and no working archive was found, so only the company page is linked. linkedin.com/company/squid-energy.

  10. City AM, on the CMA's review of Iberdrola's purchase of Electricity North West: 14 licensed distribution networks owned by six groups before the deal; Solar Power Portal: acquisition completed in October 2024. cityam.com; solarpowerportal.co.uk (accessed 1 October 2026)

  11. ENGIE, "ENGIE announces the acquisition of UK Power Networks", 25 February 2026; completion on 7 May 2026 (RNS 4346D). en.newsroom.engie.com (press release) (accessed 16 October 2026)

  12. Ofgem, RIIO-ED2 Final Determinations NGED Annex, 30 November 2022, Table 21: Engineering Justification Papers rated unjustified fell from 48 at draft (of the 187 papers reviewed, out of 193 submitted) to 3 at final, after NGED supplied further evidence on need, deliverability and individual assets. Tables 16 to 19: operational IT and telecoms allowed at £48M, £68M, £34M and £44M, and non-operational IT and telecoms at £64M, £74M, £44M and £50M, across the four licence areas over 2023 to 2028 (2020/21 prices, net before non-price control allocations), a total of £426M. After those allocations, non-operational IT and telecoms falls to £58M, £65M, £39M and £45M, for a total of £401M. Table 2: load-related capex submitted at £931M and allowed at £716M before non-price control allocations, or £851M after them. ofgem.gov.uk (accessed 21 October 2026)

  13. EPRI, "Why Does Distribution Grid Model Management Matter?", newsletter of the Grid Model Data Management project, product 3002022737, September 2021: in distribution the master record is usually a GIS built for maps and asset records; studies use extracts converted for each tool and supplemented or corrected there; each tool needs its own representation, and manual updating causes data errors. Page 1: duplicated, manual modelling is much less common in distribution than in transmission because of the volume of activity, and most utilities have a GIS-based single source of truth. epri.com (PDF) (accessed 2 November 2026)

  14. Stephanie Hay and Anna Ferguson (TNEI Services), "A Review of Power System Modelling Platforms and Capabilities", paper 3 of 15 in an IET Special Interest Publication for the Council for Science and Technology, March 2015: GB network companies' modelling can span several software packages; companies prefer extending the platforms they use over moving to an entirely new one; CIM recommended to avoid laborious and error-prone data conversion. The authors note TNEI's link with IPSA Power. theiet.org (PDF) (accessed 2 November 2026) Checked by hand on 11 November 2026: several packages within companies (pages 3 and 10), the preference for extending current platforms (page 11), CIM to avoid laborious and error-prone conversion (pages 10 and 11), and TNEI's link with IPSA Power (page 5).

  15. Electricity North West, ENWL013 closedown report (Network Innovation Allowance project): an IPSA model of the network downstream of Heysham grid supply point was converted to PowerFactory using bespoke software developed by project partner WSP. enwl.co.uk (PDF) (accessed 2 November 2026)

  16. SSEN, Digital Strategy, December 2019, published by Ofgem: names the challenge of fragmented and orphaned data sets, and describes consolidating planning and operational data sets into a Digital System Map built on CIM. ofgem.gov.uk (PDF) (accessed 2 November 2026)

  17. Ofgem, RIIO-ED2 Draft Determinations, WPD Annex, 29 June 2022: 193 Engineering Justification Papers submitted, of which Ofgem's engineers reviewed 187: 48 rated unjustified, 50 partially justified and 89 justified. The unjustified cases named in Appendix 1 failed on the need for the work, the options considered, or the lack of asset-by-asset detail. ofgem.gov.uk (PDF) (accessed 7 October 2026)

  18. Ofgem, RIIO-ED2 Final Determinations, Northern Powergrid annex, 30 November 2022: Engineering Justification Papers rated unjustified fell from 13 of 61 at draft to 1 at final. ofgem.gov.uk (PDF) (accessed 5 October 2026)

  19. Ofgem, Long Term Development Statement direction (April 2024) and CIM extension decisions: Stage 3 publication on 30 November 2026, including "CIM Difference Models for all firm development projects"; in the November 2024 extension letter the DNOs said tools for testing and validation were not yet available from market vendors, and that some vendors would need to add difference-recording. In the May 2026 letter, Ofgem moved the Stage 3 production deadline to 15 October 2026, kept publication at 30 November 2026, and said any further derogation request must be backed by stakeholder engagement. The DNOs' request of 23 April 2026, attached to that letter, says future-year models will include all planned network changes, lists difference models among Stage 3 items for further consideration (citing duplication and systems' readiness), describes connections data as uncertain during connections reform, and defers persistent substation identifiers to November 2026. ofgem.gov.uk (Nov 2024 letter); ofgem.gov.uk (May 2026 letter) (accessed 1 October 2026)

  20. ENTSO-E: Common Information Model and CGMES for grid model exchange across European grids. entsoe.eu

  21. TNEI, "Adopting Common Information Model (CIM) and Common Grid Model Exchange Specification (CGMES) for GB Distribution Network Assessment", 12 May 2026: first CIM-based models published November 2025; data quality mixed, with naming conventions differing between companies. TNEI judged the first release, which held only the Equipment profile, not quite yet usable for load flow and connection studies in most practical cases. TNEI owns the IPSA software. tneigroup.com (accessed 1 October 2026)

  22. IEC 61970-552, CIMXML model exchange format: defines difference models, which record the statements added to and removed from a base model in place of a full copy. Explained with worked examples in SOPTIM's openCGMES documentation. opencgmes.soptim.de (accessed 2 November 2026)

  23. Ofgem, RIIO-ED3 (2028 to 2033): business plans due December 2026, draft determinations in summer 2027, final decisions by the end of 2027, with capital spending controlled through strong evidence thresholds and in-period adjustments. The notes to editors also mention engineering evidence and benchmarking. Ofgem press release, 21 May 2026. ofgem.gov.uk (accessed 29 September 2026)

  24. Ofgem, ED3 Sector Specific Methodology Decision, core document, 21 May 2026: each company's strategy should explain how it weighs reinforcement against flexibility, with decision criteria. ofgem.gov.uk (PDF) (accessed 29 September 2026)

  25. ThinkLabs AI: $28M Series A, 31 March 2026, led by Energy Impact Partners with NVIDIA's NVentures and Edison International. venturebeat.com (accessed 6 October 2026)

  26. GridCARE: $64M Series A, May 2026, led by Sutter Hill Ventures. siliconangle.com (accessed 6 October 2026)

  27. DIgSILENT, PowerFactory "Working in a team" paper: project versioning, base and derived projects, and a Compare & Merge tool. The white paper describes a base model published by a model administrator, derived models that store only their changes, two- and three-way Compare & Merge with a dialog for resolving conflicts, and a centralised database. digsilent.de (accessed 1 October 2026)

  28. ENTSO-E, "Quality of CGMES Datasets and Calculations", version 4.1.4, approved 7 October 2025: quality criteria and indicators for individual and common grid models, required for the merging process to produce plausible common grid models. ENTSO-E, CIM Model Exchange Profile 1, first edition, 10 May 2009: the first CIM-based exchange specification for grid models. ENTSO-E's CGMES Library: CGMES 2.4.15 is the version used for the Common Grid Model programme go-live in 2021. Quality of CGMES Datasets v4.1.4 (PDF); CIM Profile 1 (PDF); ENTSO-E CIM page listing Profile 1; CGMES Library (accessed 10 and 12 November 2026)

  29. National Grid Electricity Distribution, Connected Data Portal, "Case studies: our open data in action": lists Squid's LTDS CIM Explorer and FlexPortal. connecteddata.nationalgrid.co.uk (accessed 1 October 2026) Archived 11 November 2026: web.archive.org.

  30. National Grid Electricity Distribution (as WPD), innovation project "Common Information Model", NIA_WPD_016, May 2016 to August 2018, with CGI as a funded partner: extended the Integrated Network Model to export CIM. The project registration names CGI, and the closedown report records its inputs. nationalgrid.co.uk (project); nationalgrid.co.uk (registration); nationalgrid.co.uk (closedown report) (accessed 12 November 2026) Archived 11 November 2026: web.archive.org.

  31. National Grid Electricity Distribution, Connected Data Portal: CIM datasets for all four licence areas, generated by the NGED Integrated Network Model. connecteddata.nationalgrid.co.uk (accessed 7 October 2026)

  32. YoungCapital, "Software Engineer (Power Systems)", a copy of Squid's advert posted 14 March 2026 and now closed: asks for power systems modelling experience, including load flow, short circuit and contingency studies, for planning, analysis and connections work. youngcapital.uk (accessed 12 November 2026)

  33. Aspen Technology, "Aspen Technology Announces Expansion of Digital Grid Management Suite with Acquisition of Open Grid Systems", 4 November 2024: Open Grid Systems founded in 2010 and headquartered in Glasgow. businesswire.com (accessed 2 November 2026)

  34. Itron, "Itron Acquires Elpis Squared", 5 March 2024 (Elpis Squared founded in 2013, headquartered in Newport Beach, California), and Itron Form 8-K, 5 March 2024: purchase price $35M, and more than 10 years of operational experience with North America's largest investor-owned utilities. Itron's 10-Q for the quarter to 30 September 2024 records the price as $34.1M. businesswire.com; investors.itron.com; sec.gov (8-K); sec.gov (8-K exhibit 99.1); sec.gov (10-Q note) (accessed 10 November 2026)

  35. Model-management products: Siemens Gridscale X Network Model Manager; AspenTech Cimphony Network Model Management; IPS-Energy NMM. siemens.com; aspentech.com; ips-energy.com (accessed 6 October 2026)

  36. Y Combinator, company profile for Nira Energy (YC W22): software that shows available capacity at every interconnection point on the electrical grid, for renewable energy developers. ycombinator.com (accessed 10 November 2026)

  37. ETAP, company and product pages: electrical power system modelling and analysis software, including power flow and distribution network analysis. etap.com (accessed 10 November 2026)

  38. Eaton, CYME distribution system analysis package (CYMDIST): modelling and analysis tools for electric distribution system planning, including load flow. eaton.com (accessed 10 November 2026)

  39. Enverus, "Undo the queue: Enverus acquires Pearl Street Technologies to solve for a more reliable, resilient grid", 13 March 2025: Pearl Street's SUGAR software automates interconnection and other grid planning studies. enverus.com (accessed 10 November 2026)

  40. Siemens, PSS®MOD product page: a web-based central repository for submitting, validating and auditing planning model data, including planned network changes, for transmission planning. siemens.com (accessed 7 October 2026)

  41. SSEN, Project MERLIN page: with Open Grid Systems, covering automated network modelling, concluded October 2021. ENA Smarter Networks Portal, project NIA_SSEN_0041 (MERLIN), October 2019 to October 2021: names OGS's Cimphony tool for CIM conversion. ssen.co.uk (MERLIN page); smarter.energynetworks.org (NIA_SSEN_0041) (accessed 12 November 2026) Archived 12 November 2026: web.archive.org.

  42. SSEN, NeRDA (Near Real-time Data Access), project NIA_SSEN_0050: a demonstrator that makes near real-time network data available through an API, delivered with Open Grid Systems. SSEN's 2024 summit slides give the portal address as nerda.opengrid.com. Ofgem's August 2026 draft re-opener decision proposes funding to move NeRDA into business as usual [59]. smarter.energynetworks.org (project); smarter.energynetworks.org (slides, PDF) (accessed 10 November 2026) Archived 11 November 2026: web.archive.org (project); web.archive.org (slides).

  43. SSEN, "DSO Powering Change: SSEN DSO Submission 2026", page 14: in the Planning row of a table, its Network Model Manager is "embedded as the single source of truth, strengthening model completeness, consistency and governance". The page heading says its capabilities "link planning, operations and markets". Page 11 describes a programme to build an automatically updated digital master model. Vendor not named. Archived copy, 11 November 2026: web.archive.org (PDF) (accessed 10 and 12 November 2026; the original ssen.co.uk link no longer opens).

  44. CGI, "CGI OpenGrid Foundation Integrated Network Model": described as already being delivered into the business-as-usual operations of Western Power Distribution (now NGED) and SP Energy Networks. The brochure is undated, and uses the Western Power Distribution name, so it predates NGED's renaming in September 2022. SP Energy Networks, "We're partnering with CGI on innovative digital network modelling" (2020). cgi.com; spenergynetworks.co.uk (accessed 10 November 2026)

  45. IAF CertSearch, the global database of accredited management-system certificates: a search on 12 November 2026 lists Squid Group Inc. (San Francisco) with one active certificate, ISO/IEC 27001:2022, number GCI/IS/202603009, issued by Gradient Certification Inc under accreditation from the United Accreditation Foundation (UAF). Its scope covers the design, development, deployment and operation of the Squid platform for grid planning and network analysis, with the infrastructure and support functions behind it. The register entry was last updated on 13 August 2026. Squid Labs Ltd is not listed separately. Search results cannot be linked directly, so AlphaVenture holds dated screenshots. iafcertsearch.org (searched 12 November 2026)

  46. Squid, trust centre: ISO 27001, SOC 2 Type I and Type II, GDPR and Cyber Essentials listed, each available on request; release note "Q1 2026 - Initial Platform Release", published 5 April 2026, still the only release note on 18 October 2026. On 5 November 2026, Squid's security page stated ISO 27001:2022 and SOC 2 Type I and Type II certification. trust.squid.energy (accessed 6 and 18 October 2026)

  47. ENTSO-E, CGMES Library, "CIM-based Network Model Management Implementation Guide", version 1.0, approved by ENTSO-E's ICT Committee on 2 July 2026, with appendix material. entsoe.eu; implementation guide (PDF) (accessed 10 November 2026)

  48. Aspen Technology, Form 10-Q for the quarter to 31 December 2024: Open Grid Systems acquisition completed 15 November 2024 for total cash consideration of $48.9M. The filing breaks this down as $39.8M paid at closing and $9.1M held back until May 2026. sec.gov (accessed 7 October 2026)

  49. TA Associates, "PowerGEM Acquires Power Info, Strengthening Power System Modeling Capabilities", 19 August 2026: Power Info, founded in 2007 and based in the Seattle area, makes CIMSpy, which automates the exchange, integration, validation and management of power system models, and CIMdesk, its CGMES version for European transmission operators. Terms not disclosed. ta.com (accessed 12 November 2026)

  50. iTWire, "Neara acquires Zepben to deliver integrated physical and electrical digital twin capabilities", 15 October 2026: Zepben, an Australian company specialising in CIM-based electrical network modelling for utilities. Herbert Smith Freehills Kramer advised Neara on the purchase. itwire.com; hsfkramer.com (accessed 10 November 2026)

  51. squid.energy/security: certifications, and the statements that Squid "operates at the planning layer, not the control layer" and "never writes to OT, SCADA or ADMS" (reviewer's check, 8 November 2026). squid.energy/security

  52. ACER, "Managing the ramp-up of electricity distribution investments to better serve grid users: ACER report on distribution system operator (DSO) revenue setting practices", 14 April 2026: data from 191 large distribution system operators in 25 EU member states and Norway; about 8% of customers are served by operators with fewer than 100,000 customers, EU law lets member states exempt operators with fewer than 100,000 customers from network development plans, and at least ten have done so for some of them. Across the EU and Norway, ACER counts 2,674 distribution companies in 28 countries, 92% of them small (fewer than 100,000 customers or small isolated systems). The investment data excludes Bulgaria and Denmark, while the 2,674 count covers all 28 countries. That about 8% of companies are large is our derivation from the 92% figure. acer.europa.eu (accessed 19 October 2026)

  53. pv magazine, "European power grid investment set to rise sharply by 2027", 15 April 2026, reporting ACER's 2026 findings: distribution investment up 51% between 2021 and 2024 to €35.3B a year, projected at €46.7B by 2027; uneven digitalisation across EU network companies. pv-magazine.com (accessed 2 November 2026)

  54. Directive (EU) 2024/1711 of the European Parliament and of the Council of 13 June 2024, amending Directive (EU) 2019/944. The amended Article 31(3) requires distribution system operators to publish clear information on the capacity available for new connections in their area of operation, with high spatial granularity, and to update it at least quarterly. Paragraph 3b lets member states exempt undertakings that serve fewer than 100,000 connected customers. Article 3 sets transposition by 17 January 2025. eur-lex.europa.eu (accessed 16 November 2026)

  55. Ofgem, "Innovation": the Network Innovation Allowance gives each network licensee an amount to spend on innovation projects of its choice, and the Strategic Innovation Fund supports larger projects in partnership; Ofgem, Strategic Innovation Fund page: the fund is part of RIIO-2 for gas and electricity networks, worth £450M, and distribution network companies can take part from 2023. Electricity North West's innovation funding page also describes the fund. ofgem.gov.uk; enwl.co.uk; ofgem.gov.uk (SIF) (accessed 2 and 12 November 2026)

  56. SSEPD (now SSEN), IFI Report 2013-2014, pages 142 and 148: Open Grid Systems listed as R&D provider on two projects, 2013_16 and 2014_02, one starting 19 February 2014. The IFI Report 2014-2015 lists 2014_02 as the Field Team Support Tool. NIA_SSEPD_0007, the Field Team Support Tool with Open Grid Systems (April 2015 to July 2018), is the 2015 follow-on. IFI 2013-14 (PDF); IFI 2014-15 (PDF); smarter.energynetworks.org (NIA_SSEPD_0007) (accessed 12 November 2026)

  57. Ofgem, "RIIO-ED2 Re-opener Applications 2026: Draft Determinations", 19 August 2026, paragraphs 2.52 to 2.69 and Table 3: NGED requested £27.76M for three Digitalisation projects, and Ofgem proposed £20.85M across its four licensees (2020/21 prices). For the project covering a Connected Data Portal, a Regulatory and Reporting Platform and Digital Twin capability, Ofgem proposed funding only the Connected Data Portal and LAEP+ deployment. It said GC0139 and the LTDS do not require a Digital Twin platform. Final Determinations are expected by the end of 2026. ofgem.gov.uk (PDF) (accessed 10 November 2026)

  58. Find a Tender, notice 2023/S 000-020073, Northern Powergrid, "Low Voltage Distribution System Analysis Tool": awarded to EA Technology Limited on 13 July 2023; £656,000 excluding VAT. Awarded directly, without competition, after Northern Powergrid found no other suitable tool. find-tender.service.gov.uk (accessed 7 October 2026)

  59. Y Combinator, "The Y Combinator Deal": YC invests $500,000 in every company it accepts. $125,000 converts into a fixed 7%, and $375,000 is invested on an uncapped safe with most-favoured-nation terms. ycombinator.com/deal (accessed 10 November 2026)

  60. 33East, LinkedIn post, “Backing Squid (YC W26) was one of the fastest decisions we have made”: 33East says it is investing alongside Y Combinator, 20VC, Angel Invest, Leap Forward Ventures, Energetik Ventures and other investors. The post also names a third team member, Finn Hudson, beside the two founders, without giving his role. linkedin.com/posts/33east_backing-squid-yc-w26 (accessed 18 November 2026)

Sources and approach. This report uses public sources only, with no product access, confidential material or interviews. Figures were checked against their sources on the dates shown in the references. On 5 November 2026, Ofgem's page on its publishing rules still listed 30 November 2026 for the next stage, and we found no further change to the requirements. The report uses no web-traffic or other third-party tool estimates. Its figures come from documents, registers and company statements.

Stance and disclosure. Where the report labels a statement as our judgement, assumption or model, it is AlphaVenture's research judgement. This report is not investment, legal, medical or regulatory advice. AlphaVenture has no interest in, or relationship with, Squid or any other company named in this report, financial or otherwise. This report draws only on public sources. It was shared with Squid, with an invitation to comment, and any corrections will be reflected in later versions. All product and company names and logos belong to their respective owners.

Data sources. Ofgem, National Grid Electricity Distribution, Northern Powergrid, ACER, EPRI, the IET, Companies House, the IASME and IAF certificate registers, and Squid's website and trust centre. All claims were checked against their sources where possible, and claims we could not confirm are marked throughout.